Loosen fastening nuts -1-, loosen screws -2- a quarter of a turn. Remove engine cover.
Remove screws -arrows- for coolant pipe and pull coolant pipe forward slightly. Remove screws -1- and -3-, open and remove clamp -2-. Carefully remove the converter towards the top.
Installation
Note: Replace self-locking nuts and screws as well as O-rings and seals after removal. Use factory-installed clamps to secure all hoses. Install the cable ties in the appropriate places.
Install a new gasket on the centering lug of the inlet pipe of the converter, fit a new clamp on the inlet pipe. Install the converter from top to bottom so that the threaded pins fit into the holes in the bottom bracket.