1. Poly V-belt for auxiliary equipment drive
2. Guide roller for poly V-belt
3. Pulley on the crankshaft (with vibration damper, observe the correct position for assembly)
4. Fastening bolt - 10 Nm + turn an additional 90° (¼ turn)
5. Centering sleeve (ensure correct installation in the auxiliary unit bracket, the centering sleeve is located in the upper right screw hole)
6. Fastening bolt - 20 Nm + turn an additional 45° (⅛ of a turn)
7. Fastening bolt - 50 Nm + turn an additional 90° (¼ turn)
8. Timing belt guide roller
9. Fastening bolt - 15 Nm
10. Timing belt guide roller
11. Auxiliary units bracket
12. High pressure pump
13. Screw
14. Alternating current generator
15. Screw
16. Air conditioning compressor
17. Screw
18. Centering sleeve (ensure correct installation in the accessory bracket, the centering sleeve is in the lower right screw hole)
19. Screw
(View the original on the website: www.SkodaBook.ru)
